ISTQB

Loading

ISTQB Sample Exam : Foundation Level (CTFL)

CTFL (Foundation)
CTFL (Foundation)
Author
QTPExpert
Date
2014-07-14 03:31
Views
62864943
1. ‘Defect Density’ calculated in terms of

A. The number of defects identified in a component or system divided by the size of the component or the system

B. The number of defects found by a test phase divided by the number found by that test phase and any other means after wards

C. The number of defects identified in the component or system divided by the number of defects found by a test phase

D. The number of defects found by a test phase divided by the number found by the size of the system


2. From the below given choices, which one is the ‘Confidence testing’

A. Sanity testing

B. System testing

C. Smoke testing

D. Regression testing


3. COTS is known as
A. Commercial off the shelf software
B. Compliance of the software
C. Change control of the software
D. Capable off the shelf software


4. ‘Be bugging’ is known as
A. Preventing the defects by inspection
B. Fixing the defects by debugging
C. Adding known defects by seeding
D. A process of fixing the defects by tester

5. An expert based test estimation is also known as
A. Narrow band Delphi
B. Wide band Delphi
C. Bespoke Delphi
D. Robust Delphi

6.
When testing a grade calculation system, a tester determines that all
scores from 90 to 100 will yield a grade of A, but scores below 90 will
not. This analysis is known as:

A. Equivalence partitioning
B. Boundary value analysis
C. Decision table
D. Hybrid analysis

7. All of the following might be done during unit testing except

A. Desk check
B. Manual support testing
C. Walkthrough
D. Compiler based testing

9. Which of the following characteristics is primarily associated with software reusability?

A. The extent to which the software can be used in other applications
B. The extent to which the software can be used by many different users
C. The capability of the software to be moved to a different platform
D. The capability of one system to be coupled with another system

10.
Which of the following software change management activities is most
vital to assessing the impact of proposed software modifications?
A. Baseline identification B. Configuration auditing
C. Change control D. Version control

11. Which of the following statements is true about a software verification and validation program?

I. It strives to ensure that quality is built into software.
II. It provides management with insights into the state of a software project.
III. It ensures that alpha, beta, and system tests are performed.
IV. It is executed in parallel with software development activities.

A. I, II&III B.II, III&IV C.I, II&IV D.I, III&IV

12. Which of the following is a requirement of an effective software environment?

I. Ease of use
II. Capacity for incremental implementation
III. Capability of evolving with the needs of a project
IV. Inclusion of advanced tools

A.I, II &III B.I, II &IV C.II, III&IV D.I, III&IV

13. A test manager wants to use the resources available for the automated testing of a web application. The best choice is

A. Test automater, web specialist, DBA, test lead
B. Tester, test automater, web specialist, DBA
C. Tester, test lead, test automater, DBA
D. Tester, web specialist, test lead, test automater

14.
A project manager has been transferred to a major software development
project that is in the implementation phase. The highest priority for
this project manager should be to
B. Establish a relationship with the customer
C. Learn the project objectives and the existing project plan
D. Modify the project’ s organizational structure to meet the manager’ s management style
E. Ensure that the project proceeds at its current pace



15. Change X requires a higher level of authority than Change Y in which of the following pairs?

Change X Change Y
A. Code in development Code in production
B. Specifications during requirements analysis Specifications during systems test
C. Documents requested by the technical development group Documents requested by customers
D. A product distributed to several sites A product with a single user


16. Which of the following functions is typically supported by a software quality information system?
I. Record keeping
II. System design
III. Evaluation scheduling
IV. Error reporting

A.I, II&III B.II, III &IV C.I, III &IV D.I, II & IV

17.
During the testing of a module tester ‘X’ finds a bug and assigned it
to developer. But developer rejects the same, saying that it’s not a
bug. What ‘X’ should do?

A. Report the issue to the test manager and try to settle with the developer.
B. Retest the module and confirm the bug
C. Assign the same bug to another developer
D. Send to the detailed information of the bug encountered and check the reproducibility

18. The primary goal of comparing a user manual with the actual behavior of the running program during system testing is to

A. Find bugs in the program
B. Check the technical accuracy of the document
C. Ensure the ease of use of the document
D. Ensure that the program is the latest version

19.
A type of integration testing in which software elements, hardware
elements, or both are combined all at once into a component or an
overall system, rather than in stages.
A. System Testing B. Big-Bang Testing
C. Integration Testing D. Unit Testing

20.
In practice, which Life Cycle model may have more, fewer or different
levels of development and testing, depending on the project and the
software product. For example, there may be component integration
testing after component testing, and system integration testing after
system testing.

A. Water Fall Model B.V-Model
C. Spiral Model D. RAD Model

21.
Which technique can be used to achieve input and output coverage? It
can be applied to human input, input via interfaces to a system, or
interface parameters in integration testing.
A. Error Guessing B. Boundary Value Analysis
C. Decision Table testing D. Equivalence partitioning

22.
There is one application, which runs on a single terminal. There is
another application that works on multiple terminals. What are the test
techniques you will use on the second application that you would not do
on the first application?

A. Integrity, Response time B. Concurrency test, Scalability
C. Update & Rollback, Response time D. Concurrency test, Integrity

23.
You are the test manager and you are about the start the system
testing. The developer team says that due to change in requirements they
will be able to deliver the system to you for testing 5 working days
after the due date. You can not change the resources(work hours, test
tools, etc.) What steps you will take to be able to finish the testing
in time. (

A. Tell to the development team to deliver the system in time so that testing activity will be finish in time.
B. Extend the testing plan, so that you can accommodate the slip going to occur
C. Rank the functionality as per risk and concentrate more on critical functionality testing
D. Add more resources so that the slippage should be avoided

24. Item transmittal report is also known as

A. Incident report B. Release note
C. Review report D. Audit report

25. Testing of software used to convert data from existing systems for use in replacement systems
A. Data driven testing B. Migration testing
C. Configuration testing D. Back to back testing

26. Big bang approach is related to

A. Regression testing B. Inter system testing
C. Re-testing D. Integration testing

27. Cause effect graphing is related to the standard

A. BS7799 B. BS 7925/2 C. ISO/IEC 926/1 D. ISO/IEC 2382/1

28. “The tracing of requirements for a test level through the layers of a test documentation” done by

A. Horizontal tracebility B. Depth tracebility
C. Vertical tracebility D. Horizontal & Vertical tracebilities

29. A test harness is a
A. A high level document describing the principles, approach and major objectives of the organization regarding testing
B. A distance set of test activities collected into a manageable phase of a project
C. A test environment comprised of stubs and drives needed to conduct a test
D. A set of several test cases for a component or system under test


30.
You are a tester for testing a large system. The system data model is
very large with many attributes and there are a lot of inter
dependencies with in the fields. What steps would you use to test the
system and also what are the efforts of the test you have taken on the
test plan

A. Improve super vision, More reviews of artifacts or program means stage containment of the defects.
B. Extend the test plan so that you can test all the inter dependencies
C. Divide the large system in to small modules and test the functionality
D. Test the interdependencies first, after that check the system as a whole

31.
Change request should be submitted through development or program
management. A change request must be written and should include the
following criteria.
I. Definition of the change
II. Documentation to be updated
III. Name of the tester or developer
IV. Dependencies of the change request.

A. I, III and IV B. I, II and III C. II, III and IV D. I, II and IV


32. ‘Entry criteria’ should address questions such as

I.
Are the necessary documentation, design and requirements information
available that will allow testers to operate the system and judge
correct behavior.
II. Is the test environment-lab, hardware, software and system administration support ready?
III.
Those conditions and situations that must prevail in the testing
process to allow testing to continue effectively and efficiently.
IV. Are the supporting utilities, accessories and prerequisites available in forms that testers can use

A. I, II and IV B. I, II and III C. I, II, III and IV D. II, III and IV.

33. “This life cycle model is basically driven by schedule and budget risks” This statement is best suited for
A. Water fall model B. Spiral model
C. Incremental model D. V-Model

34. The bug tracking system will need to capture these phases for each bug.

I. Phase injected
II. Phase detected
III. Phase fixed
IV. Phase removed

A. I, II and III B. I, II and IV C. II, III and IV D. I, III and IV

35.
One of the more daunting challenges of managing a test project is that
so many dependencies converge at test execution. One missing
configuration file or hard ware device can render all your test results
meaning less. You can end up with an entire platoon of testers sitting
around for days.
Who is responsible for this incident?

A. Test managers faults only
B. Test lead faults only
C. Test manager and project manager faults
D. Testers faults only






36. System test can begin when?

I. The test team competes a three day smoke test and reports on the results to the system test phase entry meeting
II. The development team provides software to the test team 3 business days prior to starting of the system testing
III. All components are under formal, automated configuration and release management control

A. I and II only B. II and III only C. I and III only D. I, II and III

37. Test charters are used in ________ testing

A. Exploratory testing B. Usability testing
C. Component testing D. Maintainability testing



Answer
1 (A) 20 (B)
2 (A) 21 (D)
3 (A) 22 (C)
4 (C) 23 (C)
5 (B) 24 (B)
6 (A) 25 (B)
7 (B) 26 (D)
8 (B) 27 (B)
9 (A) 28 (A)
10 (C) 29 (C)
11 (C) 30 (A)
12 (A) 31 (D)
13 (B) 32 (A)
14 (B) 33 (D)
15 (D) 34 (B)
16 (C) 35 (A)
17 (D) 36 (D)
18 (B) 37 (A)
19 (B)
Total 3

  • 2012-11-20 19:04

    I think in question 3 the answer shall be A:

    3. COTS is known as 

    A. Commercial off the shelf software


  • 2012-12-11 18:26

    Agree with jjj9. I just have searched for COST and result must be (A) Commercial off the shelf.


  • 2012-12-13 04:14

    Answer corrected as suggested by jjj9 and smalldragon


Total 1,272
Number Title Author Date Votes Views
Notice
ISTQB_CTAL-TM_Syllabus v3.0
admin | 2025.06.16 | Votes 0 | Views 40799707
admin 2025.06.16 0 40799707
Notice
CTFL (Certified Tester Foundation Level) Syllabus 4.0
admin | 2024.09.15 | Votes 0 | Views 52620150
admin 2024.09.15 0 52620150
Notice
ISTQB Foundation - Certified Tester (2018) : Official Sample Exam Set 2 with Answer (4)
Testersbest | 2019.06.21 | Votes 0 | Views 61630034
Testersbest 2019.06.21 0 61630034
Notice
ISTQB Foundation - Certified Tester (2018) : Official Sample Exam Set 1 with Answer (3)
Testersbest | 2019.06.21 | Votes 0 | Views 61692677
Testersbest 2019.06.21 0 61692677
Notice
ISTQB Foundation Certified Tester (2018) : New Exam Rule (1)
Testersbest | 2019.06.21 | Votes 0 | Views 63078384
Testersbest 2019.06.21 0 63078384
Notice
ISTQB Foundation - Certified Tester Syllabus (2018)
VTB | 2018.11.14 | Votes 0 | Views 63012158
VTB 2018.11.14 0 63012158
Notice
ISTQB Advanced Level Syllabus (2016) Security Tester
VTB | 2018.10.26 | Votes 0 | Views 61752795
VTB 2018.10.26 0 61752795
Notice
ISTQB Advanced Level Syllabus (2012) Technical Test Analyst
VTB | 2016.05.06 | Votes 0 | Views 61083719
VTB 2016.05.06 0 61083719
Notice
ISTQB Advanced Level Syllabus (2012) Test Manager
VTB | 2016.05.06 | Votes 0 | Views 62200755
VTB 2016.05.06 0 62200755
Notice
ISTQB Advanced Level Syllabus (2012) Test Analyst
VTB | 2016.05.06 | Votes 0 | Views 61461419
VTB 2016.05.06 0 61461419
Notice
ISTQB Glossary of Testing Terms Version:2.2
VTB | 2016.05.06 | Votes 0 | Views 61834903
VTB 2016.05.06 0 61834903
Notice
ISTQB Expert Level (CTEL) Syllabus -Test Management (3)
VTB | 2015.09.13 | Votes 0 | Views 61370401
VTB 2015.09.13 0 61370401
Notice
ISTQB Expert Level (CTEL) Syllabus - Improving the Testing Process (1)
VTB | 2015.09.13 | Votes 0 | Views 62486260
VTB 2015.09.13 0 62486260
Notice
ISTQB Foundation Level (CTFL) Syllabus 2011 (12)
VTB | 2014.10.11 | Votes 0 | Views 61622396
VTB 2014.10.11 0 61622396
1258
ISTQB CTAL TAE Syllabus v2.0
admin | 2025.06.16 | Votes 1 | Views 40381496
admin 2025.06.16 1 40381496
1257
ISTQB Question and Answers (Advanced Level)
Steveskok | 2021.02.07 | Votes 0 | Views 61920910
Steveskok 2021.02.07 0 61920910
1256
ISTQB Certified Tester Foundation Level Syllabus Version 2018 V3.1
(TestExpert) | 2020.02.03 | Votes 0 | Views 61587974
(TestExpert) 2020.02.03 0 61587974
1255
ISTQB Advanced - Technical Test Analyst Sample Exam
ItSeTsQtB | 2019.08.08 | Votes 1 | Views 61474562
ItSeTsQtB 2019.08.08 1 61474562
1254
ISTQB Certification and Training Value
^Software^ | 2019.07.22 | Votes 0 | Views 62740231
^Software^ 2019.07.22 0 62740231
1253
ISTQB Foundation - Agile Tester (Sample Exam)
IT-Tester | 2019.07.08 | Votes 0 | Views 60615141
IT-Tester 2019.07.08 0 60615141
1252
ISTQB Advanced - Technical Test Analyst (Sample Exam)
IT-Tester | 2019.07.08 | Votes 0 | Views 61591896
IT-Tester 2019.07.08 0 61591896
1251
ISTQB Advanced - Test Analyst (Sample Exam) (1)
IT-Tester | 2019.07.08 | Votes 0 | Views 62107795
IT-Tester 2019.07.08 0 62107795
1250
Premium Question Paper 4 (3)
iknev | 2019.02.22 | Votes 0 | Views 62756432
iknev 2019.02.22 0 62756432
1249
Premium Question Paper 3 (6)
iknev | 2019.02.22 | Votes 0 | Views 61051358
iknev 2019.02.22 0 61051358
1248
Premium Question Paper 1 (2)
iknev | 2019.02.22 | Votes 0 | Views 62008865
iknev 2019.02.22 0 62008865
1247
ISTQB Question Bank_ Test Manager Sample Question Set 1
iknev | 2019.02.22 | Votes 1 | Views 61962739
iknev 2019.02.22 1 61962739
1246
ISTQB Certified Tester List (FULL)
VTB | 2018.10.31 | Votes 0 | Views 62193383
VTB 2018.10.31 0 62193383
1245
ISTQB Agile Exam (Auckland, NZ)
VTB | 2018.10.28 | Votes 0 | Views 62411504
VTB 2018.10.28 0 62411504
1244
ISTQB Foundation Exam (Auckland, NZ)
VTB | 2018.10.28 | Votes 0 | Views 62792349
VTB 2018.10.28 0 62792349
1243
ISTQB Foundation Course (Auckland, NZ)
VTB | 2018.10.28 | Votes 0 | Views 61930140
VTB 2018.10.28 0 61930140
1242
ISTQB Foundation Agile Course (Auckland, NZ)
VTB | 2018.10.28 | Votes 0 | Views 61095174
VTB 2018.10.28 0 61095174
1241
ISTQB Course + Internship (Auckland, NZ)
VTB | 2018.10.28 | Votes 0 | Views 61638769
VTB 2018.10.28 0 61638769
1240
ISTQB Expert - Improving the Test Process [Sample Exam & Answer] - ISTQB Official
VTB | 2018.10.26 | Votes 0 | Views 61999144
VTB 2018.10.26 0 61999144
1239
ISTQB Expert - Test Manager [Sample Exam & Answer] - ISTQB Official (1)
VTB | 2018.10.26 | Votes 0 | Views 61866083
VTB 2018.10.26 0 61866083
1238
ISTQB Advanced - Technical Test Analyst [Sample Exam & Answer] - ISTQB Official
VTB | 2018.10.26 | Votes 0 | Views 62626565
VTB 2018.10.26 0 62626565
1237
ISTQB Advanced - Test Analyst [Sample Exam & Answer] - ISTQB Official
VTB | 2018.10.26 | Votes 0 | Views 62440191
VTB 2018.10.26 0 62440191
1236
ISTQB Advanced - Test Manager [Sample Exam & Answer] - ISTQB Official (1)
VTB | 2018.10.26 | Votes 0 | Views 62369563
VTB 2018.10.26 0 62369563
1235
ISTQB Foundation - Model Based Tester [Sample Exam & Answers] - ISTQB Official
VTB | 2018.10.26 | Votes 0 | Views 62489495
VTB 2018.10.26 0 62489495
1234
ISTQB Foundation - Agile Tester [Sample Exam & Answer] - ISTQB Official
VTB | 2018.10.26 | Votes 0 | Views 61086621
VTB 2018.10.26 0 61086621
1233
ISTQB Foundation - Certified Tester [Sample Exam & Answer] - ISTQB Official (1)
VTB | 2018.10.26 | Votes 0 | Views 61458722
VTB 2018.10.26 0 61458722
1232
ISTQB Exam Tips and Tricks
VTB | 2018.10.16 | Votes 0 | Views 62480296
VTB 2018.10.16 0 62480296
1231
ISTQB Foundation Level Quiz 20 Questions (1)
aiitistqb | 2018.10.16 | Votes 0 | Views 62805259
aiitistqb 2018.10.16 0 62805259
1230
ISTQB Free Sample Exam and Answers
aiitistqb | 2018.10.16 | Votes 0 | Views 61996227
aiitistqb 2018.10.16 0 61996227
1229
ISTQB Foundation - Agile Extension Online Courses is live!!
VTB | 2018.10.16 | Votes 0 | Views 61573168
VTB 2018.10.16 0 61573168
1228
ISTQB Foundation Online Courses are Live!!
VTB | 2018.10.12 | Votes 0 | Views 63342869
VTB 2018.10.12 0 63342869
1227
ISTQB Foundation (Practice Exam)
VTB | 2018.10.12 | Votes 0 | Views 61347721
VTB 2018.10.12 0 61347721
1226
CTAL TM Questions (23)
ulissesmafra | 2018.10.09 | Votes 1 | Views 61954311
ulissesmafra 2018.10.09 1 61954311
1225
Syllabus 2012 (2)
ulissesmafra | 2018.10.09 | Votes 0 | Views 62467365
ulissesmafra 2018.10.09 0 62467365
1224
ISEB & ISTQB EXAM TIPS (3)
Sky Driver | 2018.09.24 | Votes 0 | Views 61452952
Sky Driver 2018.09.24 0 61452952
1223
Tips for clearing ISTQB Foundation Level Exam (1)
Sky Driver | 2018.09.24 | Votes 0 | Views 62401663
Sky Driver 2018.09.24 0 62401663
1222
Tips for passing the ISTQB Foundation Level exam – Do’s and Don’t’s
Sky Driver | 2018.09.24 | Votes 0 | Views 62225278
Sky Driver 2018.09.24 0 62225278
1221
Why do people fail the ISTQB Foundation Certificate? (1)
Sky Driver | 2018.09.24 | Votes 0 | Views 61910971
Sky Driver 2018.09.24 0 61910971
1220
ISTQB Foundation Mock Exam 2 (3)
peter_hey | 2018.09.19 | Votes 3 | Views 62410482
peter_hey 2018.09.19 3 62410482
1219
ISTQB Foundation Mock Exam 1 (3)
peter_hey | 2018.09.19 | Votes 0 | Views 61150907
peter_hey 2018.09.19 0 61150907
1218
What is ISTQB? (1)
master15 | 2018.09.19 | Votes 0 | Views 62420503
master15 2018.09.19 0 62420503
1217
Syllabus (2)
richp | 2018.09.18 | Votes 0 | Views 62852600
richp 2018.09.18 0 62852600
1216
Learning Objectives for ISTQB Advanced Level Technical Test Analyst Exam (1)
master15 | 2018.09.16 | Votes 0 | Views 61564115
master15 2018.09.16 0 61564115
1215
Software Testing Tools used by ISTQB certified Experts like Test Analysts and Technical Test Analysts (2)
master15 | 2018.09.16 | Votes 0 | Views 63005151
master15 2018.09.16 0 63005151
1214
What are the Advantages of ISTQB Certifications? (1)
master15 | 2018.09.13 | Votes 0 | Views 61956726
master15 2018.09.13 0 61956726
1213
How many Levels of Certification are provided by ISTQB? (1)
master15 | 2018.09.13 | Votes 0 | Views 62020644
master15 2018.09.13 0 62020644
1212
Syllabus CTAL-TTA - [BR] (1)
tcorteletti | 2018.09.09 | Votes 0 | Views 60781770
tcorteletti 2018.09.09 0 60781770
1211
Syllabus CTFL - [BR] (1)
tcorteletti | 2018.09.09 | Votes 0 | Views 61291152
tcorteletti 2018.09.09 0 61291152
1210
ISTQB Certification – Foundation Level syllabus
Sky Driver | 2018.09.05 | Votes 0 | Views 61604689
Sky Driver 2018.09.05 0 61604689
1209
Documents to be submitted at the time of registration of ISTQB Advanced Level (2)
Sky Driver | 2018.09.05 | Votes 0 | Views 61806544
Sky Driver 2018.09.05 0 61806544