![]()
ISTQB Sample Exam : Foundation Level (CTFL)
CTFL (Foundation)
CTFL (Foundation)
Author
QTPExpert
Date
2014-07-14 03:31
Views
57939764
1. ‘Defect Density’ calculated in terms of
A. The number of defects identified in a component or system divided by the size of the component or the system
B. The number of defects found by a test phase divided by the number found by that test phase and any other means after wards
C. The number of defects identified in the component or system divided by the number of defects found by a test phase
D. The number of defects found by a test phase divided by the number found by the size of the system
2. From the below given choices, which one is the ‘Confidence testing’
A. Sanity testing
B. System testing
C. Smoke testing
D. Regression testing
3. COTS is known as
A. Commercial off the shelf software
B. Compliance of the software
C. Change control of the software
D. Capable off the shelf software
4. ‘Be bugging’ is known as
A. Preventing the defects by inspection
B. Fixing the defects by debugging
C. Adding known defects by seeding
D. A process of fixing the defects by tester
5. An expert based test estimation is also known as
A. Narrow band Delphi
B. Wide band Delphi
C. Bespoke Delphi
D. Robust Delphi
6.
When testing a grade calculation system, a tester determines that all
scores from 90 to 100 will yield a grade of A, but scores below 90 will
not. This analysis is known as:
A. Equivalence partitioning
B. Boundary value analysis
C. Decision table
D. Hybrid analysis
7. All of the following might be done during unit testing except
A. Desk check
B. Manual support testing
C. Walkthrough
D. Compiler based testing
9. Which of the following characteristics is primarily associated with software reusability?
A. The extent to which the software can be used in other applications
B. The extent to which the software can be used by many different users
C. The capability of the software to be moved to a different platform
D. The capability of one system to be coupled with another system
10.
Which of the following software change management activities is most
vital to assessing the impact of proposed software modifications?
A. Baseline identification B. Configuration auditing
C. Change control D. Version control
11. Which of the following statements is true about a software verification and validation program?
I. It strives to ensure that quality is built into software.
II. It provides management with insights into the state of a software project.
III. It ensures that alpha, beta, and system tests are performed.
IV. It is executed in parallel with software development activities.
A. I, II&III B.II, III&IV C.I, II&IV D.I, III&IV
12. Which of the following is a requirement of an effective software environment?
I. Ease of use
II. Capacity for incremental implementation
III. Capability of evolving with the needs of a project
IV. Inclusion of advanced tools
A.I, II &III B.I, II &IV C.II, III&IV D.I, III&IV
13. A test manager wants to use the resources available for the automated testing of a web application. The best choice is
A. Test automater, web specialist, DBA, test lead
B. Tester, test automater, web specialist, DBA
C. Tester, test lead, test automater, DBA
D. Tester, web specialist, test lead, test automater
14.
A project manager has been transferred to a major software development
project that is in the implementation phase. The highest priority for
this project manager should be to
B. Establish a relationship with the customer
C. Learn the project objectives and the existing project plan
D. Modify the project’ s organizational structure to meet the manager’ s management style
E. Ensure that the project proceeds at its current pace
15. Change X requires a higher level of authority than Change Y in which of the following pairs?
Change X Change Y
A. Code in development Code in production
B. Specifications during requirements analysis Specifications during systems test
C. Documents requested by the technical development group Documents requested by customers
D. A product distributed to several sites A product with a single user
16. Which of the following functions is typically supported by a software quality information system?
I. Record keeping
II. System design
III. Evaluation scheduling
IV. Error reporting
A.I, II&III B.II, III &IV C.I, III &IV D.I, II & IV
17.
During the testing of a module tester ‘X’ finds a bug and assigned it
to developer. But developer rejects the same, saying that it’s not a
bug. What ‘X’ should do?
A. Report the issue to the test manager and try to settle with the developer.
B. Retest the module and confirm the bug
C. Assign the same bug to another developer
D. Send to the detailed information of the bug encountered and check the reproducibility
18. The primary goal of comparing a user manual with the actual behavior of the running program during system testing is to
A. Find bugs in the program
B. Check the technical accuracy of the document
C. Ensure the ease of use of the document
D. Ensure that the program is the latest version
19.
A type of integration testing in which software elements, hardware
elements, or both are combined all at once into a component or an
overall system, rather than in stages.
A. System Testing B. Big-Bang Testing
C. Integration Testing D. Unit Testing
20.
In practice, which Life Cycle model may have more, fewer or different
levels of development and testing, depending on the project and the
software product. For example, there may be component integration
testing after component testing, and system integration testing after
system testing.
A. Water Fall Model B.V-Model
C. Spiral Model D. RAD Model
21.
Which technique can be used to achieve input and output coverage? It
can be applied to human input, input via interfaces to a system, or
interface parameters in integration testing.
A. Error Guessing B. Boundary Value Analysis
C. Decision Table testing D. Equivalence partitioning
22.
There is one application, which runs on a single terminal. There is
another application that works on multiple terminals. What are the test
techniques you will use on the second application that you would not do
on the first application?
A. Integrity, Response time B. Concurrency test, Scalability
C. Update & Rollback, Response time D. Concurrency test, Integrity
23.
You are the test manager and you are about the start the system
testing. The developer team says that due to change in requirements they
will be able to deliver the system to you for testing 5 working days
after the due date. You can not change the resources(work hours, test
tools, etc.) What steps you will take to be able to finish the testing
in time. (
A. Tell to the development team to deliver the system in time so that testing activity will be finish in time.
B. Extend the testing plan, so that you can accommodate the slip going to occur
C. Rank the functionality as per risk and concentrate more on critical functionality testing
D. Add more resources so that the slippage should be avoided
24. Item transmittal report is also known as
A. Incident report B. Release note
C. Review report D. Audit report
25. Testing of software used to convert data from existing systems for use in replacement systems
A. Data driven testing B. Migration testing
C. Configuration testing D. Back to back testing
26. Big bang approach is related to
A. Regression testing B. Inter system testing
C. Re-testing D. Integration testing
27. Cause effect graphing is related to the standard
A. BS7799 B. BS 7925/2 C. ISO/IEC 926/1 D. ISO/IEC 2382/1
28. “The tracing of requirements for a test level through the layers of a test documentation” done by
A. Horizontal tracebility B. Depth tracebility
C. Vertical tracebility D. Horizontal & Vertical tracebilities
29. A test harness is a
A. A high level document describing the principles, approach and major objectives of the organization regarding testing
B. A distance set of test activities collected into a manageable phase of a project
C. A test environment comprised of stubs and drives needed to conduct a test
D. A set of several test cases for a component or system under test
30.
You are a tester for testing a large system. The system data model is
very large with many attributes and there are a lot of inter
dependencies with in the fields. What steps would you use to test the
system and also what are the efforts of the test you have taken on the
test plan
A. Improve super vision, More reviews of artifacts or program means stage containment of the defects.
B. Extend the test plan so that you can test all the inter dependencies
C. Divide the large system in to small modules and test the functionality
D. Test the interdependencies first, after that check the system as a whole
31.
Change request should be submitted through development or program
management. A change request must be written and should include the
following criteria.
I. Definition of the change
II. Documentation to be updated
III. Name of the tester or developer
IV. Dependencies of the change request.
A. I, III and IV B. I, II and III C. II, III and IV D. I, II and IV
32. ‘Entry criteria’ should address questions such as
I.
Are the necessary documentation, design and requirements information
available that will allow testers to operate the system and judge
correct behavior.
II. Is the test environment-lab, hardware, software and system administration support ready?
III.
Those conditions and situations that must prevail in the testing
process to allow testing to continue effectively and efficiently.
IV. Are the supporting utilities, accessories and prerequisites available in forms that testers can use
A. I, II and IV B. I, II and III C. I, II, III and IV D. II, III and IV.
33. “This life cycle model is basically driven by schedule and budget risks” This statement is best suited for
A. Water fall model B. Spiral model
C. Incremental model D. V-Model
34. The bug tracking system will need to capture these phases for each bug.
I. Phase injected
II. Phase detected
III. Phase fixed
IV. Phase removed
A. I, II and III B. I, II and IV C. II, III and IV D. I, III and IV
35.
One of the more daunting challenges of managing a test project is that
so many dependencies converge at test execution. One missing
configuration file or hard ware device can render all your test results
meaning less. You can end up with an entire platoon of testers sitting
around for days.
Who is responsible for this incident?
A. Test managers faults only
B. Test lead faults only
C. Test manager and project manager faults
D. Testers faults only
36. System test can begin when?
I. The test team competes a three day smoke test and reports on the results to the system test phase entry meeting
II. The development team provides software to the test team 3 business days prior to starting of the system testing
III. All components are under formal, automated configuration and release management control
A. I and II only B. II and III only C. I and III only D. I, II and III
37. Test charters are used in ________ testing
A. Exploratory testing B. Usability testing
C. Component testing D. Maintainability testing
Answer
1 (A) 20 (B)
2 (A) 21 (D)
3 (A) 22 (C)
4 (C) 23 (C)
5 (B) 24 (B)
6 (A) 25 (B)
7 (B) 26 (D)
8 (B) 27 (B)
9 (A) 28 (A)
10 (C) 29 (C)
11 (C) 30 (A)
12 (A) 31 (D)
13 (B) 32 (A)
14 (B) 33 (D)
15 (D) 34 (B)
16 (C) 35 (A)
17 (D) 36 (D)
18 (B) 37 (A)
19 (B)
A. The number of defects identified in a component or system divided by the size of the component or the system
B. The number of defects found by a test phase divided by the number found by that test phase and any other means after wards
C. The number of defects identified in the component or system divided by the number of defects found by a test phase
D. The number of defects found by a test phase divided by the number found by the size of the system
2. From the below given choices, which one is the ‘Confidence testing’
A. Sanity testing
B. System testing
C. Smoke testing
D. Regression testing
3. COTS is known as
A. Commercial off the shelf software
B. Compliance of the software
C. Change control of the software
D. Capable off the shelf software
4. ‘Be bugging’ is known as
A. Preventing the defects by inspection
B. Fixing the defects by debugging
C. Adding known defects by seeding
D. A process of fixing the defects by tester
5. An expert based test estimation is also known as
A. Narrow band Delphi
B. Wide band Delphi
C. Bespoke Delphi
D. Robust Delphi
6.
When testing a grade calculation system, a tester determines that all
scores from 90 to 100 will yield a grade of A, but scores below 90 will
not. This analysis is known as:
A. Equivalence partitioning
B. Boundary value analysis
C. Decision table
D. Hybrid analysis
7. All of the following might be done during unit testing except
A. Desk check
B. Manual support testing
C. Walkthrough
D. Compiler based testing
9. Which of the following characteristics is primarily associated with software reusability?
A. The extent to which the software can be used in other applications
B. The extent to which the software can be used by many different users
C. The capability of the software to be moved to a different platform
D. The capability of one system to be coupled with another system
10.
Which of the following software change management activities is most
vital to assessing the impact of proposed software modifications?
A. Baseline identification B. Configuration auditing
C. Change control D. Version control
11. Which of the following statements is true about a software verification and validation program?
I. It strives to ensure that quality is built into software.
II. It provides management with insights into the state of a software project.
III. It ensures that alpha, beta, and system tests are performed.
IV. It is executed in parallel with software development activities.
A. I, II&III B.II, III&IV C.I, II&IV D.I, III&IV
12. Which of the following is a requirement of an effective software environment?
I. Ease of use
II. Capacity for incremental implementation
III. Capability of evolving with the needs of a project
IV. Inclusion of advanced tools
A.I, II &III B.I, II &IV C.II, III&IV D.I, III&IV
13. A test manager wants to use the resources available for the automated testing of a web application. The best choice is
A. Test automater, web specialist, DBA, test lead
B. Tester, test automater, web specialist, DBA
C. Tester, test lead, test automater, DBA
D. Tester, web specialist, test lead, test automater
14.
A project manager has been transferred to a major software development
project that is in the implementation phase. The highest priority for
this project manager should be to
B. Establish a relationship with the customer
C. Learn the project objectives and the existing project plan
D. Modify the project’ s organizational structure to meet the manager’ s management style
E. Ensure that the project proceeds at its current pace
15. Change X requires a higher level of authority than Change Y in which of the following pairs?
Change X Change Y
A. Code in development Code in production
B. Specifications during requirements analysis Specifications during systems test
C. Documents requested by the technical development group Documents requested by customers
D. A product distributed to several sites A product with a single user
16. Which of the following functions is typically supported by a software quality information system?
I. Record keeping
II. System design
III. Evaluation scheduling
IV. Error reporting
A.I, II&III B.II, III &IV C.I, III &IV D.I, II & IV
17.
During the testing of a module tester ‘X’ finds a bug and assigned it
to developer. But developer rejects the same, saying that it’s not a
bug. What ‘X’ should do?
A. Report the issue to the test manager and try to settle with the developer.
B. Retest the module and confirm the bug
C. Assign the same bug to another developer
D. Send to the detailed information of the bug encountered and check the reproducibility
18. The primary goal of comparing a user manual with the actual behavior of the running program during system testing is to
A. Find bugs in the program
B. Check the technical accuracy of the document
C. Ensure the ease of use of the document
D. Ensure that the program is the latest version
19.
A type of integration testing in which software elements, hardware
elements, or both are combined all at once into a component or an
overall system, rather than in stages.
A. System Testing B. Big-Bang Testing
C. Integration Testing D. Unit Testing
20.
In practice, which Life Cycle model may have more, fewer or different
levels of development and testing, depending on the project and the
software product. For example, there may be component integration
testing after component testing, and system integration testing after
system testing.
A. Water Fall Model B.V-Model
C. Spiral Model D. RAD Model
21.
Which technique can be used to achieve input and output coverage? It
can be applied to human input, input via interfaces to a system, or
interface parameters in integration testing.
A. Error Guessing B. Boundary Value Analysis
C. Decision Table testing D. Equivalence partitioning
22.
There is one application, which runs on a single terminal. There is
another application that works on multiple terminals. What are the test
techniques you will use on the second application that you would not do
on the first application?
A. Integrity, Response time B. Concurrency test, Scalability
C. Update & Rollback, Response time D. Concurrency test, Integrity
23.
You are the test manager and you are about the start the system
testing. The developer team says that due to change in requirements they
will be able to deliver the system to you for testing 5 working days
after the due date. You can not change the resources(work hours, test
tools, etc.) What steps you will take to be able to finish the testing
in time. (
A. Tell to the development team to deliver the system in time so that testing activity will be finish in time.
B. Extend the testing plan, so that you can accommodate the slip going to occur
C. Rank the functionality as per risk and concentrate more on critical functionality testing
D. Add more resources so that the slippage should be avoided
24. Item transmittal report is also known as
A. Incident report B. Release note
C. Review report D. Audit report
25. Testing of software used to convert data from existing systems for use in replacement systems
A. Data driven testing B. Migration testing
C. Configuration testing D. Back to back testing
26. Big bang approach is related to
A. Regression testing B. Inter system testing
C. Re-testing D. Integration testing
27. Cause effect graphing is related to the standard
A. BS7799 B. BS 7925/2 C. ISO/IEC 926/1 D. ISO/IEC 2382/1
28. “The tracing of requirements for a test level through the layers of a test documentation” done by
A. Horizontal tracebility B. Depth tracebility
C. Vertical tracebility D. Horizontal & Vertical tracebilities
29. A test harness is a
A. A high level document describing the principles, approach and major objectives of the organization regarding testing
B. A distance set of test activities collected into a manageable phase of a project
C. A test environment comprised of stubs and drives needed to conduct a test
D. A set of several test cases for a component or system under test
30.
You are a tester for testing a large system. The system data model is
very large with many attributes and there are a lot of inter
dependencies with in the fields. What steps would you use to test the
system and also what are the efforts of the test you have taken on the
test plan
A. Improve super vision, More reviews of artifacts or program means stage containment of the defects.
B. Extend the test plan so that you can test all the inter dependencies
C. Divide the large system in to small modules and test the functionality
D. Test the interdependencies first, after that check the system as a whole
31.
Change request should be submitted through development or program
management. A change request must be written and should include the
following criteria.
I. Definition of the change
II. Documentation to be updated
III. Name of the tester or developer
IV. Dependencies of the change request.
A. I, III and IV B. I, II and III C. II, III and IV D. I, II and IV
32. ‘Entry criteria’ should address questions such as
I.
Are the necessary documentation, design and requirements information
available that will allow testers to operate the system and judge
correct behavior.
II. Is the test environment-lab, hardware, software and system administration support ready?
III.
Those conditions and situations that must prevail in the testing
process to allow testing to continue effectively and efficiently.
IV. Are the supporting utilities, accessories and prerequisites available in forms that testers can use
A. I, II and IV B. I, II and III C. I, II, III and IV D. II, III and IV.
33. “This life cycle model is basically driven by schedule and budget risks” This statement is best suited for
A. Water fall model B. Spiral model
C. Incremental model D. V-Model
34. The bug tracking system will need to capture these phases for each bug.
I. Phase injected
II. Phase detected
III. Phase fixed
IV. Phase removed
A. I, II and III B. I, II and IV C. II, III and IV D. I, III and IV
35.
One of the more daunting challenges of managing a test project is that
so many dependencies converge at test execution. One missing
configuration file or hard ware device can render all your test results
meaning less. You can end up with an entire platoon of testers sitting
around for days.
Who is responsible for this incident?
A. Test managers faults only
B. Test lead faults only
C. Test manager and project manager faults
D. Testers faults only
36. System test can begin when?
I. The test team competes a three day smoke test and reports on the results to the system test phase entry meeting
II. The development team provides software to the test team 3 business days prior to starting of the system testing
III. All components are under formal, automated configuration and release management control
A. I and II only B. II and III only C. I and III only D. I, II and III
37. Test charters are used in ________ testing
A. Exploratory testing B. Usability testing
C. Component testing D. Maintainability testing
Answer
1 (A) 20 (B)
2 (A) 21 (D)
3 (A) 22 (C)
4 (C) 23 (C)
5 (B) 24 (B)
6 (A) 25 (B)
7 (B) 26 (D)
8 (B) 27 (B)
9 (A) 28 (A)
10 (C) 29 (C)
11 (C) 30 (A)
12 (A) 31 (D)
13 (B) 32 (A)
14 (B) 33 (D)
15 (D) 34 (B)
16 (C) 35 (A)
17 (D) 36 (D)
18 (B) 37 (A)
19 (B)
Total 1,272
| Number | Title | Author | Date | Votes | Views |
| Notice |
ISTQB_CTAL-TM_Syllabus v3.0
admin
|
2025.06.16
|
Votes 0
|
Views 35918837
|
admin | 2025.06.16 | 0 | 35918837 |
| Notice |
CTFL (Certified Tester Foundation Level) Syllabus 4.0
admin
|
2024.09.15
|
Votes 0
|
Views 47850009
|
admin | 2024.09.15 | 0 | 47850009 |
| Notice |
ISTQB Foundation - Certified Tester (2018) : Official Sample Exam Set 2 with Answer (4)
Testersbest
|
2019.06.21
|
Votes 0
|
Views 56810987
|
Testersbest | 2019.06.21 | 0 | 56810987 |
| Notice |
ISTQB Foundation - Certified Tester (2018) : Official Sample Exam Set 1 with Answer (3)
Testersbest
|
2019.06.21
|
Votes 0
|
Views 56743565
|
Testersbest | 2019.06.21 | 0 | 56743565 |
| Notice |
ISTQB Foundation Certified Tester (2018) : New Exam Rule (1)
Testersbest
|
2019.06.21
|
Votes 0
|
Views 57908477
|
Testersbest | 2019.06.21 | 0 | 57908477 |
| Notice |
ISTQB Foundation - Certified Tester Syllabus (2018)
VTB
|
2018.11.14
|
Votes 0
|
Views 58068394
|
VTB | 2018.11.14 | 0 | 58068394 |
| Notice |
ISTQB Advanced Level Syllabus (2016) Security Tester
VTB
|
2018.10.26
|
Votes 0
|
Views 57140818
|
VTB | 2018.10.26 | 0 | 57140818 |
| Notice |
ISTQB Advanced Level Syllabus (2012) Technical Test Analyst
VTB
|
2016.05.06
|
Votes 0
|
Views 55968233
|
VTB | 2016.05.06 | 0 | 55968233 |
| Notice |
ISTQB Advanced Level Syllabus (2012) Test Manager
VTB
|
2016.05.06
|
Votes 0
|
Views 56858748
|
VTB | 2016.05.06 | 0 | 56858748 |
| Notice |
ISTQB Advanced Level Syllabus (2012) Test Analyst
VTB
|
2016.05.06
|
Votes 0
|
Views 56810068
|
VTB | 2016.05.06 | 0 | 56810068 |
| Notice |
ISTQB Glossary of Testing Terms Version:2.2
VTB
|
2016.05.06
|
Votes 0
|
Views 57157074
|
VTB | 2016.05.06 | 0 | 57157074 |
| Notice |
ISTQB Expert Level (CTEL) Syllabus -Test Management (3)
VTB
|
2015.09.13
|
Votes 0
|
Views 56595465
|
VTB | 2015.09.13 | 0 | 56595465 |
| Notice |
ISTQB Expert Level (CTEL) Syllabus - Improving the Testing Process (1)
VTB
|
2015.09.13
|
Votes 0
|
Views 57482974
|
VTB | 2015.09.13 | 0 | 57482974 |
| Notice |
ISTQB Foundation Level (CTFL) Syllabus 2011 (12)
VTB
|
2014.10.11
|
Votes 0
|
Views 56742520
|
VTB | 2014.10.11 | 0 | 56742520 |
| 1258 |
ISTQB CTAL TAE Syllabus v2.0
admin
|
2025.06.16
|
Votes 1
|
Views 35589325
|
admin | 2025.06.16 | 1 | 35589325 |
| 1257 |
ISTQB Question and Answers (Advanced Level)
Steveskok
|
2021.02.07
|
Votes 0
|
Views 57280325
|
Steveskok | 2021.02.07 | 0 | 57280325 |
| 1256 |
ISTQB Certified Tester Foundation Level Syllabus Version 2018 V3.1
(TestExpert)
|
2020.02.03
|
Votes 0
|
Views 56556528
|
(TestExpert) | 2020.02.03 | 0 | 56556528 |
| 1255 |
ISTQB Advanced - Technical Test Analyst Sample Exam
ItSeTsQtB
|
2019.08.08
|
Votes 1
|
Views 56607883
|
ItSeTsQtB | 2019.08.08 | 1 | 56607883 |
| 1254 |
ISTQB Certification and Training Value
^Software^
|
2019.07.22
|
Votes 0
|
Views 57866612
|
^Software^ | 2019.07.22 | 0 | 57866612 |
| 1253 |
ISTQB Foundation - Agile Tester (Sample Exam)
IT-Tester
|
2019.07.08
|
Votes 0
|
Views 55841927
|
IT-Tester | 2019.07.08 | 0 | 55841927 |
| 1252 |
ISTQB Advanced - Technical Test Analyst (Sample Exam)
IT-Tester
|
2019.07.08
|
Votes 0
|
Views 56556525
|
IT-Tester | 2019.07.08 | 0 | 56556525 |
| 1251 |
ISTQB Advanced - Test Analyst (Sample Exam) (1)
IT-Tester
|
2019.07.08
|
Votes 0
|
Views 57472396
|
IT-Tester | 2019.07.08 | 0 | 57472396 |
| 1250 |
Premium Question Paper 4 (3)
iknev
|
2019.02.22
|
Votes 0
|
Views 57895693
|
iknev | 2019.02.22 | 0 | 57895693 |
| 1249 |
Premium Question Paper 3 (6)
iknev
|
2019.02.22
|
Votes 0
|
Views 56155191
|
iknev | 2019.02.22 | 0 | 56155191 |
| 1248 |
Premium Question Paper 1 (2)
iknev
|
2019.02.22
|
Votes 0
|
Views 57352931
|
iknev | 2019.02.22 | 0 | 57352931 |
| 1247 |
ISTQB Question Bank_ Test Manager Sample Question Set 1
iknev
|
2019.02.22
|
Votes 1
|
Views 56998615
|
iknev | 2019.02.22 | 1 | 56998615 |
| 1246 |
ISTQB Certified Tester List (FULL)
VTB
|
2018.10.31
|
Votes 0
|
Views 57449884
|
VTB | 2018.10.31 | 0 | 57449884 |
| 1245 |
ISTQB Agile Exam (Auckland, NZ)
VTB
|
2018.10.28
|
Votes 0
|
Views 57480225
|
VTB | 2018.10.28 | 0 | 57480225 |
| 1244 |
ISTQB Foundation Exam (Auckland, NZ)
VTB
|
2018.10.28
|
Votes 0
|
Views 57782901
|
VTB | 2018.10.28 | 0 | 57782901 |
| 1243 |
ISTQB Foundation Course (Auckland, NZ)
VTB
|
2018.10.28
|
Votes 0
|
Views 56753404
|
VTB | 2018.10.28 | 0 | 56753404 |
| 1242 |
ISTQB Foundation Agile Course (Auckland, NZ)
VTB
|
2018.10.28
|
Votes 0
|
Views 56264387
|
VTB | 2018.10.28 | 0 | 56264387 |
| 1241 |
ISTQB Course + Internship (Auckland, NZ)
VTB
|
2018.10.28
|
Votes 0
|
Views 56960323
|
VTB | 2018.10.28 | 0 | 56960323 |
| 1240 |
ISTQB Expert - Improving the Test Process [Sample Exam & Answer] - ISTQB Official
VTB
|
2018.10.26
|
Votes 0
|
Views 57105604
|
VTB | 2018.10.26 | 0 | 57105604 |
| 1239 |
ISTQB Expert - Test Manager [Sample Exam & Answer] - ISTQB Official (1)
VTB
|
2018.10.26
|
Votes 0
|
Views 56950678
|
VTB | 2018.10.26 | 0 | 56950678 |
| 1238 |
ISTQB Advanced - Technical Test Analyst [Sample Exam & Answer] - ISTQB Official
VTB
|
2018.10.26
|
Votes 0
|
Views 57264661
|
VTB | 2018.10.26 | 0 | 57264661 |
| 1237 |
ISTQB Advanced - Test Analyst [Sample Exam & Answer] - ISTQB Official
VTB
|
2018.10.26
|
Votes 0
|
Views 57215483
|
VTB | 2018.10.26 | 0 | 57215483 |
| 1236 |
ISTQB Advanced - Test Manager [Sample Exam & Answer] - ISTQB Official (1)
VTB
|
2018.10.26
|
Votes 0
|
Views 57381095
|
VTB | 2018.10.26 | 0 | 57381095 |
| 1235 |
ISTQB Foundation - Model Based Tester [Sample Exam & Answers] - ISTQB Official
VTB
|
2018.10.26
|
Votes 0
|
Views 57525583
|
VTB | 2018.10.26 | 0 | 57525583 |
| 1234 |
ISTQB Foundation - Agile Tester [Sample Exam & Answer] - ISTQB Official
VTB
|
2018.10.26
|
Votes 0
|
Views 56158688
|
VTB | 2018.10.26 | 0 | 56158688 |
| 1233 |
ISTQB Foundation - Certified Tester [Sample Exam & Answer] - ISTQB Official (1)
VTB
|
2018.10.26
|
Votes 0
|
Views 56985982
|
VTB | 2018.10.26 | 0 | 56985982 |
| 1232 |
ISTQB Exam Tips and Tricks
VTB
|
2018.10.16
|
Votes 0
|
Views 57583055
|
VTB | 2018.10.16 | 0 | 57583055 |
| 1231 |
ISTQB Foundation Level Quiz 20 Questions (1)
aiitistqb
|
2018.10.16
|
Votes 0
|
Views 57914291
|
aiitistqb | 2018.10.16 | 0 | 57914291 |
| 1230 |
ISTQB Free Sample Exam and Answers
aiitistqb
|
2018.10.16
|
Votes 0
|
Views 56836382
|
aiitistqb | 2018.10.16 | 0 | 56836382 |
| 1229 |
ISTQB Foundation - Agile Extension Online Courses is live!!
VTB
|
2018.10.16
|
Votes 0
|
Views 56522633
|
VTB | 2018.10.16 | 0 | 56522633 |
| 1228 |
ISTQB Foundation Online Courses are Live!!
VTB
|
2018.10.12
|
Votes 0
|
Views 58584548
|
VTB | 2018.10.12 | 0 | 58584548 |
| 1227 |
ISTQB Foundation (Practice Exam)
VTB
|
2018.10.12
|
Votes 0
|
Views 56640855
|
VTB | 2018.10.12 | 0 | 56640855 |
| 1226 |
CTAL TM Questions (23)
ulissesmafra
|
2018.10.09
|
Votes 1
|
Views 56785437
|
ulissesmafra | 2018.10.09 | 1 | 56785437 |
| 1225 |
Syllabus 2012 (2)
ulissesmafra
|
2018.10.09
|
Votes 0
|
Views 57767202
|
ulissesmafra | 2018.10.09 | 0 | 57767202 |
| 1224 |
ISEB & ISTQB EXAM TIPS (3)
Sky Driver
|
2018.09.24
|
Votes 0
|
Views 56331133
|
Sky Driver | 2018.09.24 | 0 | 56331133 |
| 1223 |
Tips for clearing ISTQB Foundation Level Exam (1)
Sky Driver
|
2018.09.24
|
Votes 0
|
Views 57578111
|
Sky Driver | 2018.09.24 | 0 | 57578111 |
| 1222 |
Tips for passing the ISTQB Foundation Level exam – Do’s and Don’t’s
Sky Driver
|
2018.09.24
|
Votes 0
|
Views 57390521
|
Sky Driver | 2018.09.24 | 0 | 57390521 |
| 1221 |
Why do people fail the ISTQB Foundation Certificate? (1)
Sky Driver
|
2018.09.24
|
Votes 0
|
Views 56911941
|
Sky Driver | 2018.09.24 | 0 | 56911941 |
| 1220 |
ISTQB Foundation Mock Exam 2 (3)
peter_hey
|
2018.09.19
|
Votes 3
|
Views 57624349
|
peter_hey | 2018.09.19 | 3 | 57624349 |
| 1219 |
ISTQB Foundation Mock Exam 1 (3)
peter_hey
|
2018.09.19
|
Votes 0
|
Views 56119622
|
peter_hey | 2018.09.19 | 0 | 56119622 |
| 1218 |
What is ISTQB? (1)
master15
|
2018.09.19
|
Votes 0
|
Views 57504132
|
master15 | 2018.09.19 | 0 | 57504132 |
| 1217 |
Syllabus (2)
richp
|
2018.09.18
|
Votes 0
|
Views 57716948
|
richp | 2018.09.18 | 0 | 57716948 |
| 1216 |
Learning Objectives for ISTQB Advanced Level Technical Test Analyst Exam (1)
master15
|
2018.09.16
|
Votes 0
|
Views 56790169
|
master15 | 2018.09.16 | 0 | 56790169 |
| 1215 |
Software Testing Tools used by ISTQB certified Experts like Test Analysts and Technical Test Analysts (2)
master15
|
2018.09.16
|
Votes 0
|
Views 57831623
|
master15 | 2018.09.16 | 0 | 57831623 |
| 1214 |
What are the Advantages of ISTQB Certifications? (1)
master15
|
2018.09.13
|
Votes 0
|
Views 57265959
|
master15 | 2018.09.13 | 0 | 57265959 |
| 1213 |
How many Levels of Certification are provided by ISTQB? (1)
master15
|
2018.09.13
|
Votes 0
|
Views 57164596
|
master15 | 2018.09.13 | 0 | 57164596 |
| 1212 |
Syllabus CTAL-TTA - [BR] (1)
tcorteletti
|
2018.09.09
|
Votes 0
|
Views 56281730
|
tcorteletti | 2018.09.09 | 0 | 56281730 |
| 1211 |
Syllabus CTFL - [BR] (1)
tcorteletti
|
2018.09.09
|
Votes 0
|
Views 56506854
|
tcorteletti | 2018.09.09 | 0 | 56506854 |
| 1210 |
ISTQB Certification – Foundation Level syllabus
Sky Driver
|
2018.09.05
|
Votes 0
|
Views 56846971
|
Sky Driver | 2018.09.05 | 0 | 56846971 |
| 1209 |
Documents to be submitted at the time of registration of ISTQB Advanced Level (2)
Sky Driver
|
2018.09.05
|
Votes 0
|
Views 56748025
|
Sky Driver | 2018.09.05 | 0 | 56748025 |
I think in question 3 the answer shall be A:
3. COTS is known as
A. Commercial off the shelf software
Agree with jjj9. I just have searched for COST and result must be (A) Commercial off the shelf.
Answer corrected as suggested by jjj9 and smalldragon