ISTQB

Loading

ISTQB Sample Exam : Foundation Level (CTFL)

CTFL (Foundation)
CTFL (Foundation)
Author
QTPExpert
Date
2014-07-14 03:31
Views
68386171
1. ‘Defect Density’ calculated in terms of

A. The number of defects identified in a component or system divided by the size of the component or the system

B. The number of defects found by a test phase divided by the number found by that test phase and any other means after wards

C. The number of defects identified in the component or system divided by the number of defects found by a test phase

D. The number of defects found by a test phase divided by the number found by the size of the system


2. From the below given choices, which one is the ‘Confidence testing’

A. Sanity testing

B. System testing

C. Smoke testing

D. Regression testing


3. COTS is known as
A. Commercial off the shelf software
B. Compliance of the software
C. Change control of the software
D. Capable off the shelf software


4. ‘Be bugging’ is known as
A. Preventing the defects by inspection
B. Fixing the defects by debugging
C. Adding known defects by seeding
D. A process of fixing the defects by tester

5. An expert based test estimation is also known as
A. Narrow band Delphi
B. Wide band Delphi
C. Bespoke Delphi
D. Robust Delphi

6.
When testing a grade calculation system, a tester determines that all
scores from 90 to 100 will yield a grade of A, but scores below 90 will
not. This analysis is known as:

A. Equivalence partitioning
B. Boundary value analysis
C. Decision table
D. Hybrid analysis

7. All of the following might be done during unit testing except

A. Desk check
B. Manual support testing
C. Walkthrough
D. Compiler based testing

9. Which of the following characteristics is primarily associated with software reusability?

A. The extent to which the software can be used in other applications
B. The extent to which the software can be used by many different users
C. The capability of the software to be moved to a different platform
D. The capability of one system to be coupled with another system

10.
Which of the following software change management activities is most
vital to assessing the impact of proposed software modifications?
A. Baseline identification B. Configuration auditing
C. Change control D. Version control

11. Which of the following statements is true about a software verification and validation program?

I. It strives to ensure that quality is built into software.
II. It provides management with insights into the state of a software project.
III. It ensures that alpha, beta, and system tests are performed.
IV. It is executed in parallel with software development activities.

A. I, II&III B.II, III&IV C.I, II&IV D.I, III&IV

12. Which of the following is a requirement of an effective software environment?

I. Ease of use
II. Capacity for incremental implementation
III. Capability of evolving with the needs of a project
IV. Inclusion of advanced tools

A.I, II &III B.I, II &IV C.II, III&IV D.I, III&IV

13. A test manager wants to use the resources available for the automated testing of a web application. The best choice is

A. Test automater, web specialist, DBA, test lead
B. Tester, test automater, web specialist, DBA
C. Tester, test lead, test automater, DBA
D. Tester, web specialist, test lead, test automater

14.
A project manager has been transferred to a major software development
project that is in the implementation phase. The highest priority for
this project manager should be to
B. Establish a relationship with the customer
C. Learn the project objectives and the existing project plan
D. Modify the project’ s organizational structure to meet the manager’ s management style
E. Ensure that the project proceeds at its current pace



15. Change X requires a higher level of authority than Change Y in which of the following pairs?

Change X Change Y
A. Code in development Code in production
B. Specifications during requirements analysis Specifications during systems test
C. Documents requested by the technical development group Documents requested by customers
D. A product distributed to several sites A product with a single user


16. Which of the following functions is typically supported by a software quality information system?
I. Record keeping
II. System design
III. Evaluation scheduling
IV. Error reporting

A.I, II&III B.II, III &IV C.I, III &IV D.I, II & IV

17.
During the testing of a module tester ‘X’ finds a bug and assigned it
to developer. But developer rejects the same, saying that it’s not a
bug. What ‘X’ should do?

A. Report the issue to the test manager and try to settle with the developer.
B. Retest the module and confirm the bug
C. Assign the same bug to another developer
D. Send to the detailed information of the bug encountered and check the reproducibility

18. The primary goal of comparing a user manual with the actual behavior of the running program during system testing is to

A. Find bugs in the program
B. Check the technical accuracy of the document
C. Ensure the ease of use of the document
D. Ensure that the program is the latest version

19.
A type of integration testing in which software elements, hardware
elements, or both are combined all at once into a component or an
overall system, rather than in stages.
A. System Testing B. Big-Bang Testing
C. Integration Testing D. Unit Testing

20.
In practice, which Life Cycle model may have more, fewer or different
levels of development and testing, depending on the project and the
software product. For example, there may be component integration
testing after component testing, and system integration testing after
system testing.

A. Water Fall Model B.V-Model
C. Spiral Model D. RAD Model

21.
Which technique can be used to achieve input and output coverage? It
can be applied to human input, input via interfaces to a system, or
interface parameters in integration testing.
A. Error Guessing B. Boundary Value Analysis
C. Decision Table testing D. Equivalence partitioning

22.
There is one application, which runs on a single terminal. There is
another application that works on multiple terminals. What are the test
techniques you will use on the second application that you would not do
on the first application?

A. Integrity, Response time B. Concurrency test, Scalability
C. Update & Rollback, Response time D. Concurrency test, Integrity

23.
You are the test manager and you are about the start the system
testing. The developer team says that due to change in requirements they
will be able to deliver the system to you for testing 5 working days
after the due date. You can not change the resources(work hours, test
tools, etc.) What steps you will take to be able to finish the testing
in time. (

A. Tell to the development team to deliver the system in time so that testing activity will be finish in time.
B. Extend the testing plan, so that you can accommodate the slip going to occur
C. Rank the functionality as per risk and concentrate more on critical functionality testing
D. Add more resources so that the slippage should be avoided

24. Item transmittal report is also known as

A. Incident report B. Release note
C. Review report D. Audit report

25. Testing of software used to convert data from existing systems for use in replacement systems
A. Data driven testing B. Migration testing
C. Configuration testing D. Back to back testing

26. Big bang approach is related to

A. Regression testing B. Inter system testing
C. Re-testing D. Integration testing

27. Cause effect graphing is related to the standard

A. BS7799 B. BS 7925/2 C. ISO/IEC 926/1 D. ISO/IEC 2382/1

28. “The tracing of requirements for a test level through the layers of a test documentation” done by

A. Horizontal tracebility B. Depth tracebility
C. Vertical tracebility D. Horizontal & Vertical tracebilities

29. A test harness is a
A. A high level document describing the principles, approach and major objectives of the organization regarding testing
B. A distance set of test activities collected into a manageable phase of a project
C. A test environment comprised of stubs and drives needed to conduct a test
D. A set of several test cases for a component or system under test


30.
You are a tester for testing a large system. The system data model is
very large with many attributes and there are a lot of inter
dependencies with in the fields. What steps would you use to test the
system and also what are the efforts of the test you have taken on the
test plan

A. Improve super vision, More reviews of artifacts or program means stage containment of the defects.
B. Extend the test plan so that you can test all the inter dependencies
C. Divide the large system in to small modules and test the functionality
D. Test the interdependencies first, after that check the system as a whole

31.
Change request should be submitted through development or program
management. A change request must be written and should include the
following criteria.
I. Definition of the change
II. Documentation to be updated
III. Name of the tester or developer
IV. Dependencies of the change request.

A. I, III and IV B. I, II and III C. II, III and IV D. I, II and IV


32. ‘Entry criteria’ should address questions such as

I.
Are the necessary documentation, design and requirements information
available that will allow testers to operate the system and judge
correct behavior.
II. Is the test environment-lab, hardware, software and system administration support ready?
III.
Those conditions and situations that must prevail in the testing
process to allow testing to continue effectively and efficiently.
IV. Are the supporting utilities, accessories and prerequisites available in forms that testers can use

A. I, II and IV B. I, II and III C. I, II, III and IV D. II, III and IV.

33. “This life cycle model is basically driven by schedule and budget risks” This statement is best suited for
A. Water fall model B. Spiral model
C. Incremental model D. V-Model

34. The bug tracking system will need to capture these phases for each bug.

I. Phase injected
II. Phase detected
III. Phase fixed
IV. Phase removed

A. I, II and III B. I, II and IV C. II, III and IV D. I, III and IV

35.
One of the more daunting challenges of managing a test project is that
so many dependencies converge at test execution. One missing
configuration file or hard ware device can render all your test results
meaning less. You can end up with an entire platoon of testers sitting
around for days.
Who is responsible for this incident?

A. Test managers faults only
B. Test lead faults only
C. Test manager and project manager faults
D. Testers faults only






36. System test can begin when?

I. The test team competes a three day smoke test and reports on the results to the system test phase entry meeting
II. The development team provides software to the test team 3 business days prior to starting of the system testing
III. All components are under formal, automated configuration and release management control

A. I and II only B. II and III only C. I and III only D. I, II and III

37. Test charters are used in ________ testing

A. Exploratory testing B. Usability testing
C. Component testing D. Maintainability testing



Answer
1 (A) 20 (B)
2 (A) 21 (D)
3 (A) 22 (C)
4 (C) 23 (C)
5 (B) 24 (B)
6 (A) 25 (B)
7 (B) 26 (D)
8 (B) 27 (B)
9 (A) 28 (A)
10 (C) 29 (C)
11 (C) 30 (A)
12 (A) 31 (D)
13 (B) 32 (A)
14 (B) 33 (D)
15 (D) 34 (B)
16 (C) 35 (A)
17 (D) 36 (D)
18 (B) 37 (A)
19 (B)
Total 3

  • 2012-11-20 19:04

    I think in question 3 the answer shall be A:

    3. COTS is known as 

    A. Commercial off the shelf software


  • 2012-12-11 18:26

    Agree with jjj9. I just have searched for COST and result must be (A) Commercial off the shelf.


  • 2012-12-13 04:14

    Answer corrected as suggested by jjj9 and smalldragon


Total 1,272
Number Title Author Date Votes Views
Notice
ISTQB_CTAL-TM_Syllabus v3.0
admin | 2025.06.16 | Votes 0 | Views 45974471
admin 2025.06.16 0 45974471
Notice
CTFL (Certified Tester Foundation Level) Syllabus 4.0
admin | 2024.09.15 | Votes 0 | Views 57933367
admin 2024.09.15 0 57933367
Notice
ISTQB Foundation - Certified Tester (2018) : Official Sample Exam Set 2 with Answer (4)
Testersbest | 2019.06.21 | Votes 0 | Views 66700141
Testersbest 2019.06.21 0 66700141
Notice
ISTQB Foundation - Certified Tester (2018) : Official Sample Exam Set 1 with Answer (3)
Testersbest | 2019.06.21 | Votes 0 | Views 67023135
Testersbest 2019.06.21 0 67023135
Notice
ISTQB Foundation Certified Tester (2018) : New Exam Rule (1)
Testersbest | 2019.06.21 | Votes 0 | Views 68589884
Testersbest 2019.06.21 0 68589884
Notice
ISTQB Foundation - Certified Tester Syllabus (2018)
VTB | 2018.11.14 | Votes 0 | Views 68294821
VTB 2018.11.14 0 68294821
Notice
ISTQB Advanced Level Syllabus (2016) Security Tester
VTB | 2018.10.26 | Votes 0 | Views 67163783
VTB 2018.10.26 0 67163783
Notice
ISTQB Advanced Level Syllabus (2012) Technical Test Analyst
VTB | 2016.05.06 | Votes 0 | Views 66218341
VTB 2016.05.06 0 66218341
Notice
ISTQB Advanced Level Syllabus (2012) Test Manager
VTB | 2016.05.06 | Votes 0 | Views 67525030
VTB 2016.05.06 0 67525030
Notice
ISTQB Advanced Level Syllabus (2012) Test Analyst
VTB | 2016.05.06 | Votes 0 | Views 67040093
VTB 2016.05.06 0 67040093
Notice
ISTQB Glossary of Testing Terms Version:2.2
VTB | 2016.05.06 | Votes 0 | Views 67304804
VTB 2016.05.06 0 67304804
Notice
ISTQB Expert Level (CTEL) Syllabus -Test Management (3)
VTB | 2015.09.13 | Votes 0 | Views 66731474
VTB 2015.09.13 0 66731474
Notice
ISTQB Expert Level (CTEL) Syllabus - Improving the Testing Process (1)
VTB | 2015.09.13 | Votes 0 | Views 67708884
VTB 2015.09.13 0 67708884
Notice
ISTQB Foundation Level (CTFL) Syllabus 2011 (12)
VTB | 2014.10.11 | Votes 0 | Views 66588473
VTB 2014.10.11 0 66588473
1258
ISTQB CTAL TAE Syllabus v2.0
admin | 2025.06.16 | Votes 1 | Views 45667611
admin 2025.06.16 1 45667611
1257
ISTQB Question and Answers (Advanced Level)
Steveskok | 2021.02.07 | Votes 0 | Views 67528721
Steveskok 2021.02.07 0 67528721
1256
ISTQB Certified Tester Foundation Level Syllabus Version 2018 V3.1
(TestExpert) | 2020.02.03 | Votes 0 | Views 67012508
(TestExpert) 2020.02.03 0 67012508
1255
ISTQB Advanced - Technical Test Analyst Sample Exam
ItSeTsQtB | 2019.08.08 | Votes 1 | Views 66712973
ItSeTsQtB 2019.08.08 1 66712973
1254
ISTQB Certification and Training Value
^Software^ | 2019.07.22 | Votes 0 | Views 67759811
^Software^ 2019.07.22 0 67759811
1253
ISTQB Foundation - Agile Tester (Sample Exam)
IT-Tester | 2019.07.08 | Votes 0 | Views 66084491
IT-Tester 2019.07.08 0 66084491
1252
ISTQB Advanced - Technical Test Analyst (Sample Exam)
IT-Tester | 2019.07.08 | Votes 0 | Views 66941266
IT-Tester 2019.07.08 0 66941266
1251
ISTQB Advanced - Test Analyst (Sample Exam) (1)
IT-Tester | 2019.07.08 | Votes 0 | Views 67325373
IT-Tester 2019.07.08 0 67325373
1250
Premium Question Paper 4 (3)
iknev | 2019.02.22 | Votes 0 | Views 68075481
iknev 2019.02.22 0 68075481
1249
Premium Question Paper 3 (6)
iknev | 2019.02.22 | Votes 0 | Views 66427553
iknev 2019.02.22 0 66427553
1248
Premium Question Paper 1 (2)
iknev | 2019.02.22 | Votes 0 | Views 67377960
iknev 2019.02.22 0 67377960
1247
ISTQB Question Bank_ Test Manager Sample Question Set 1
iknev | 2019.02.22 | Votes 1 | Views 67470123
iknev 2019.02.22 1 67470123
1246
ISTQB Certified Tester List (FULL)
VTB | 2018.10.31 | Votes 0 | Views 67334038
VTB 2018.10.31 0 67334038
1245
ISTQB Agile Exam (Auckland, NZ)
VTB | 2018.10.28 | Votes 0 | Views 67881070
VTB 2018.10.28 0 67881070
1244
ISTQB Foundation Exam (Auckland, NZ)
VTB | 2018.10.28 | Votes 0 | Views 67850086
VTB 2018.10.28 0 67850086
1243
ISTQB Foundation Course (Auckland, NZ)
VTB | 2018.10.28 | Votes 0 | Views 66819880
VTB 2018.10.28 0 66819880
1242
ISTQB Foundation Agile Course (Auckland, NZ)
VTB | 2018.10.28 | Votes 0 | Views 66210572
VTB 2018.10.28 0 66210572
1241
ISTQB Course + Internship (Auckland, NZ)
VTB | 2018.10.28 | Votes 0 | Views 67121881
VTB 2018.10.28 0 67121881
1240
ISTQB Expert - Improving the Test Process [Sample Exam & Answer] - ISTQB Official
VTB | 2018.10.26 | Votes 0 | Views 67351596
VTB 2018.10.26 0 67351596
1239
ISTQB Expert - Test Manager [Sample Exam & Answer] - ISTQB Official (1)
VTB | 2018.10.26 | Votes 0 | Views 67559544
VTB 2018.10.26 0 67559544
1238
ISTQB Advanced - Technical Test Analyst [Sample Exam & Answer] - ISTQB Official
VTB | 2018.10.26 | Votes 0 | Views 67768865
VTB 2018.10.26 0 67768865
1237
ISTQB Advanced - Test Analyst [Sample Exam & Answer] - ISTQB Official
VTB | 2018.10.26 | Votes 0 | Views 67660362
VTB 2018.10.26 0 67660362
1236
ISTQB Advanced - Test Manager [Sample Exam & Answer] - ISTQB Official (1)
VTB | 2018.10.26 | Votes 0 | Views 67815149
VTB 2018.10.26 0 67815149
1235
ISTQB Foundation - Model Based Tester [Sample Exam & Answers] - ISTQB Official
VTB | 2018.10.26 | Votes 0 | Views 68281639
VTB 2018.10.26 0 68281639
1234
ISTQB Foundation - Agile Tester [Sample Exam & Answer] - ISTQB Official
VTB | 2018.10.26 | Votes 0 | Views 66261614
VTB 2018.10.26 0 66261614
1233
ISTQB Foundation - Certified Tester [Sample Exam & Answer] - ISTQB Official (1)
VTB | 2018.10.26 | Votes 0 | Views 66731641
VTB 2018.10.26 0 66731641
1232
ISTQB Exam Tips and Tricks
VTB | 2018.10.16 | Votes 0 | Views 67788403
VTB 2018.10.16 0 67788403
1231
ISTQB Foundation Level Quiz 20 Questions (1)
aiitistqb | 2018.10.16 | Votes 0 | Views 67996428
aiitistqb 2018.10.16 0 67996428
1230
ISTQB Free Sample Exam and Answers
aiitistqb | 2018.10.16 | Votes 0 | Views 67633363
aiitistqb 2018.10.16 0 67633363
1229
ISTQB Foundation - Agile Extension Online Courses is live!!
VTB | 2018.10.16 | Votes 0 | Views 67080145
VTB 2018.10.16 0 67080145
1228
ISTQB Foundation Online Courses are Live!!
VTB | 2018.10.12 | Votes 0 | Views 68873288
VTB 2018.10.12 0 68873288
1227
ISTQB Foundation (Practice Exam)
VTB | 2018.10.12 | Votes 0 | Views 66969079
VTB 2018.10.12 0 66969079
1226
CTAL TM Questions (23)
ulissesmafra | 2018.10.09 | Votes 1 | Views 67128995
ulissesmafra 2018.10.09 1 67128995
1225
Syllabus 2012 (2)
ulissesmafra | 2018.10.09 | Votes 0 | Views 68076558
ulissesmafra 2018.10.09 0 68076558
1224
ISEB & ISTQB EXAM TIPS (3)
Sky Driver | 2018.09.24 | Votes 0 | Views 66833760
Sky Driver 2018.09.24 0 66833760
1223
Tips for clearing ISTQB Foundation Level Exam (1)
Sky Driver | 2018.09.24 | Votes 0 | Views 67714175
Sky Driver 2018.09.24 0 67714175
1222
Tips for passing the ISTQB Foundation Level exam – Do’s and Don’t’s
Sky Driver | 2018.09.24 | Votes 0 | Views 67649196
Sky Driver 2018.09.24 0 67649196
1221
Why do people fail the ISTQB Foundation Certificate? (1)
Sky Driver | 2018.09.24 | Votes 0 | Views 66969896
Sky Driver 2018.09.24 0 66969896
1220
ISTQB Foundation Mock Exam 2 (3)
peter_hey | 2018.09.19 | Votes 3 | Views 67647221
peter_hey 2018.09.19 3 67647221
1219
ISTQB Foundation Mock Exam 1 (3)
peter_hey | 2018.09.19 | Votes 0 | Views 66378142
peter_hey 2018.09.19 0 66378142
1218
What is ISTQB? (1)
master15 | 2018.09.19 | Votes 0 | Views 67737432
master15 2018.09.19 0 67737432
1217
Syllabus (2)
richp | 2018.09.18 | Votes 0 | Views 68271601
richp 2018.09.18 0 68271601
1216
Learning Objectives for ISTQB Advanced Level Technical Test Analyst Exam (1)
master15 | 2018.09.16 | Votes 0 | Views 67100301
master15 2018.09.16 0 67100301
1215
Software Testing Tools used by ISTQB certified Experts like Test Analysts and Technical Test Analysts (2)
master15 | 2018.09.16 | Votes 0 | Views 68627358
master15 2018.09.16 0 68627358
1214
What are the Advantages of ISTQB Certifications? (1)
master15 | 2018.09.13 | Votes 0 | Views 67434430
master15 2018.09.13 0 67434430
1213
How many Levels of Certification are provided by ISTQB? (1)
master15 | 2018.09.13 | Votes 0 | Views 67553640
master15 2018.09.13 0 67553640
1212
Syllabus CTAL-TTA - [BR] (1)
tcorteletti | 2018.09.09 | Votes 0 | Views 66391645
tcorteletti 2018.09.09 0 66391645
1211
Syllabus CTFL - [BR] (1)
tcorteletti | 2018.09.09 | Votes 0 | Views 66575513
tcorteletti 2018.09.09 0 66575513
1210
ISTQB Certification – Foundation Level syllabus
Sky Driver | 2018.09.05 | Votes 0 | Views 66866665
Sky Driver 2018.09.05 0 66866665
1209
Documents to be submitted at the time of registration of ISTQB Advanced Level (2)
Sky Driver | 2018.09.05 | Votes 0 | Views 67098025
Sky Driver 2018.09.05 0 67098025