ISTQB

Loading

ISTQB CTFL Sample Exam -4 (unoffcial)

CTFL (Foundation)
CTFL (Foundation)
Author
B.Minh
Date
2012-06-16 03:08
Views
58201433
Q1. When what is visible to end-users is a deviation from the specific or expected behavior, this is called:
a) an error
b) a fault
c) a failure
d) a defect
e) a mistake

Q2. Regression testing should be performed:
v) every week
w) after the software has changed
x) as often as possible
y) when the environment has changed
z) when the project manager says

a) v & w are true, x – z are false
b) w, x & y are true, v & z are false
c) w & y are true, v, x & z are false
d) w is true, v, x y and z are false
e) all of the above are true

Q3. IEEE 829 test plan documentation standard contains all of the following except:
a) test items
b) test deliverables
c) test tasks
d) test environment
e) test specification

Q4. Testing should be stopped when:
a) all the planned tests have been run
b) time has run out
c) all faults have been fixed correctly
d) both a) and c)
e) it depends on the risks for the system being tested

Q5.
Order numbers on a stock control system can range between 10000 and
99999 inclusive. Which of the following inputs might be a result of
designing tests for only valid equivalence classes and valid boundaries:

a) 1000, 5000, 99999
b) 9999, 50000, 100000
c) 10000, 50000, 99999
d) 10000, 99999
e) 9999, 10000, 50000, 99999, 10000

Q6. Consider the following statements about early test design:
i. early test design can prevent fault multiplication
ii. faults found during early test design are more expensive to fix
iii. early test design can find faults
iv. early test design can cause changes to the requirements
v. early test design takes more effort

a) i, iii & iv are true. Ii & v are false
b) iii is true, I, ii, iv & v are false
c) iii & iv are true. i, ii & v are false
d) i, iii, iv & v are true, ii us false
e) i & iii are true, ii, iv & v are false

Q7. Non-functional system testing includes:
a) testing to see where the system does not function properly
b) testing quality attributes of the system including performance and usability
c) testing a system feature using only the software required for that action
d) testing a system feature using only the software required for that function
e) testing for functions that should not exist

Q8. Which of the following is NOT part of configuration management:
a) status accounting of configuration items
b) auditing conformance to ISO9001
c) identification of test versions
d) record of changes to documentation over time
e) controlled library access

Q9. Which of the following is the main purpose of the integration strategy for integration testing in the small?
a) to ensure that all of the small modules are tested adequately
b) to ensure that the system interfaces to other systems and networks
c) to specify which modules to combine when and how many at once
d) to ensure that the integration testing can be performed by a small team
e) to specify how the software should be divided into modules

Q10. What is the purpose of test completion criteria in a test plan:
a) to know when a specific test has finished its execution
b) to ensure that the test case specification is complete
c) to set the criteria used in generating test inputs
d) to know when test planning is complete
e) to plan when to stop testing

Q11. Consider the following statements
i. an incident may be closed without being fixed
ii. incidents may not be raised against documentation
iii. the final stage of incident tracking is fixing
iv. the incident record does not include information on test environments
v. incidents should be raised when someone other than the author of the software performs the test

a) ii and v are true, I, iii and iv are false
b) i and v are true, ii, iii and iv are false
c) i, iv and v are true, ii and iii are false
d) i and ii are true, iii, iv and v are false
e) i is true, ii, iii, iv and v are false

Q12.
Given the following code, which is true about the minimum number of
test cases required for full statement and branch coverage:Read PRead
QIF P+Q > 100 THENPrint “Large”ENDIFIf P > 50 THENPrint “P
Large”ENDIF


a) 1 test for statement coverage, 3 for branch coverage
b) 1 test for statement coverage, 2 for branch coverage
c) 1 test for statement coverage, 1 for branch coverage
d) 2 tests for statement coverage, 3 for branch coverage
e) 2 tests for statement coverage, 2 for branch coverage

Q13. Given the following:Switch PC onStart “outlook”IF outlook appears THENSend an emailClose outlook
a) 1 test for statement coverage, 1 for branch coverage
b) 1 test for statement coverage, 2 for branch coverage
c) 1 test for statement coverage. 3 for branch coverage
d) 2 tests for statement coverage, 2 for branch coverage
e) 2 tests for statement coverage, 3 for branch coverage

Q14. Given the following code, which is true:IF A > B THENC = A – BELSEC = A + BENDIFRead DIF C = D ThenPrint “Error”ENDIF
a) 1 test for statement coverage, 3 for branch coverage
b) 2 tests for statement coverage, 2 for branch coverage
c) 2 tests for statement coverage. 3 for branch coverage
d) 3 tests for statement coverage, 3 for branch coverage
e) 3 tests for statement coverage, 2 for branch coverage

Q15.
Consider the following: Pick up and read the newspaper Look at what is
on television If there is a program that you are interested in watching
then switch the the television on and watch the program Otherwise
Continue reading the newspaper If there is a crossword in the newspaper
then try and complete the crossword
a) SC = 1 and DC = 1
b) SC = 1 and DC = 2
c) SC = 1 and DC = 3
d) SC = 2 and DC = 2
e) SC = 2 and DC = 3

Q16. The place to start if you want a (new) test tool is:
a) Attend a tool exhibition
b) Invite a vendor to give a demo
c) Analyse your needs and requirements
d) Find out what your budget would be for the tool
e) Search the internet

Q17. When a new testing tool is purchased, it should be used first by:
a) A small team to establish the best way to use the tool
b) Everyone who may eventually have some use for the tool
c) The independent testing team
d) The managers to see what projects it should be used in
e) The vendor contractor to write the initial scripts

Q18. What can static analysis NOT find?
a) The use of a variable before it has been defined
b) Unreachable (“dead”) code
c) Whether the value stored in a variable is correct
d) The re-definition of a variable before it has been used
e) Array bound violations

Q19. Which of the following is NOT a black box technique:
a) Equivalence partitioning
b) State transition testing
c) LCSAJ
d) Syntax testing
e) Boundary value analysis

Q20. Beta testing is:
a) Performed by customers at their own site
b) Performed by customers at their software developer’s site
c) Performed by an independent test team
d) Useful to test bespoke software
e) Performed as early as possible in the lifecycle

Q21. Given the following types of tool, which tools would typically be used by developers and which by an independent test team:
i. static analysis
ii. performance testing
iii. test management
iv. dynamic analysis
v. test running
vi. test data preparation

a) developers would typically use i, iv and vi; test team ii, iii and v
b) developers would typically use i and iv; test team ii, iii, v and vi
c) developers would typically use i, ii, iii and iv; test team v and vi
d) developers would typically use ii, iv and vi; test team I, ii and v
e) developers would typically use i, iii, iv and v; test team ii and vi

Q22. The main focus of acceptance testing is:
a) finding faults in the system
b) ensuring that the system is acceptable to all users
c) testing the system with other systems
d) testing for a business perspective
e) testing by an independent test team

Q23. Which of the following statements about the component testing standard is false:
a) black box design techniques all have an associated measurement technique
b) white box design techniques all have an associated measurement technique
c) cyclomatic complexity is not a test measurement technique
d) black box measurement techniques all have an associated test design technique
e) white box measurement techniques all have an associated test design technique

Q24. Which of the following statements is NOT true:
a) inspection is the most formal review process
b) inspections should be led by a trained leader
c) managers can perform inspections on management documents
d) inspection is appropriate even when there are no written documents
e) inspection compares documents with predecessor (source) documents

Q25. A typical commercial test execution tool would be able to perform all of the following EXCEPT:
a) generating expected outputs
b) replaying inputs according to a programmed script
c) comparison of expected outcomes with actual outcomes
d) recording test inputs
e) reading test values from a data file

Q26. The difference between re-testing and regression testing is
a) re-testing is running a test again; regression testing looks for unexpected side effects
b) re-testing looks for unexpected side effects; regression testing is repeating those tests
c) re-testing is done after faults are fixed; regression testing is done earlier
d) re-testing uses different environments, regression testing uses the same environment
e) re-testing is done by developers, regression testing is done by independent testers

Q27. Expected results are:
a) only important in system testing
b) only used in component testing
c) never specified in advance
d) most useful when specified in advance
e) derived from the code

Q28 Test managers should not:
a) report on deviations from the project plan
b) sign the system off for release
c) re-allocate resource to meet original plans
d) raise incidents on faults that they have found
e) provide information for risk analysis and quality improvement

Q29. Unreachable code would best be found using:
a) code reviews
b) code inspections
c) a coverage tool
d) a test management tool
e) a static analysis tool

Q30. A tool that supports traceability, recording of incidents or scheduling of tests is called:
a) a dynamic analysis tool
b) a test execution tool
c) a debugging tool
d) a test management tool
e) a configuration management tool

Q31. What information need not be included in a test incident report:
a) how to fix the fault
b) how to reproduce the fault
c) test environment details
d) severity, priority
e) the actual and expected outcomes

Q32. Which expression best matches the following characteristics or review processes:
1. led by author
2. undocumented
3. no management participation
4. led by a trained moderator or leader
5. uses entry exit criteria

s) inspection
t) peer review
u) informal review
v) walkthrough

a) s = 4, t = 3, u = 2 and 5, v = 1
b) s = 4 and 5, t = 3, u = 2, v = 1
c) s = 1 and 5, t = 3, u = 2, v = 4
d) s = 5, t = 4, u = 3, v = 1 and 2
e) s = 4 and 5, t = 1, u = 2, v = 3

Q33. Which of the following is NOT part of system testing:
a) business process-based testing
b) performance, load and stress testing
c) requirements-based testing
d) usability testing
e) top-down integration testing

Q34. What statement about expected outcomes is FALSE:
a) expected outcomes are defined by the software’s behaviour
b) expected outcomes are derived from a specification, not from the code
c) expected outcomes include outputs to a screen and changes to files and databases
d) expected outcomes should be predicted before a test is run
e) expected outcomes may include timing constraints such as response times

Q35. The standard that gives definitions of testing terms is:
a) ISO/IEC 12207
b) BS7925-1
c) BS7925-2
d) ANSI/IEEE 829
e) ANSI/IEEE 729

Q36. The cost of fixing a fault:
a) Is not important
b) Increases as we move the product towards live use
c) Decreases as we move the product towards live use
d) Is more expensive if found in requirements than functional design
e) Can never be determined

Q37. Which of the following is NOT included in the Test Plan document of the Test Documentation Standard:
a) Test items (i.e. software versions)
b) What is not to be tested
c) Test environments
d) Quality plans
e) Schedules and deadlines

Q38. Could reviews or inspections be considered part of testing:
a) No, because they apply to development documentation
b) No, because they are normally applied before testing
c) No, because they do not apply to the test documentation
d) Yes, because both help detect faults and improve quality
e) Yes, because testing includes all non-constructive activities

Q39. Which of the following is not part of performance testing:
a) Measuring response time
b) Measuring transaction rates
c) Recovery testing
d) Simulating many users
e) Generating many transactions

Q40. Error guessing is best used
a) As the first approach to deriving test cases
b) After more formal techniques have been applied
c) By inexperienced testers
d) After the system has gone live
e) Only by end users


Answers:--->



Total 1

  • 2011-07-30 19:33

    Good one


Total 1,272
Number Title Author Date Votes Views
Notice
ISTQB_CTAL-TM_Syllabus v3.0
admin | 2025.06.16 | Votes 0 | Views 36176828
admin 2025.06.16 0 36176828
Notice
CTFL (Certified Tester Foundation Level) Syllabus 4.0
admin | 2024.09.15 | Votes 0 | Views 48142486
admin 2024.09.15 0 48142486
Notice
ISTQB Foundation - Certified Tester (2018) : Official Sample Exam Set 2 with Answer (4)
Testersbest | 2019.06.21 | Votes 0 | Views 57073479
Testersbest 2019.06.21 0 57073479
Notice
ISTQB Foundation - Certified Tester (2018) : Official Sample Exam Set 1 with Answer (3)
Testersbest | 2019.06.21 | Votes 0 | Views 56935793
Testersbest 2019.06.21 0 56935793
Notice
ISTQB Foundation Certified Tester (2018) : New Exam Rule (1)
Testersbest | 2019.06.21 | Votes 0 | Views 58193651
Testersbest 2019.06.21 0 58193651
Notice
ISTQB Foundation - Certified Tester Syllabus (2018)
VTB | 2018.11.14 | Votes 0 | Views 58297884
VTB 2018.11.14 0 58297884
Notice
ISTQB Advanced Level Syllabus (2016) Security Tester
VTB | 2018.10.26 | Votes 0 | Views 57423652
VTB 2018.10.26 0 57423652
Notice
ISTQB Advanced Level Syllabus (2012) Technical Test Analyst
VTB | 2016.05.06 | Votes 0 | Views 56132770
VTB 2016.05.06 0 56132770
Notice
ISTQB Advanced Level Syllabus (2012) Test Manager
VTB | 2016.05.06 | Votes 0 | Views 57074149
VTB 2016.05.06 0 57074149
Notice
ISTQB Advanced Level Syllabus (2012) Test Analyst
VTB | 2016.05.06 | Votes 0 | Views 57052961
VTB 2016.05.06 0 57052961
Notice
ISTQB Glossary of Testing Terms Version:2.2
VTB | 2016.05.06 | Votes 0 | Views 57323741
VTB 2016.05.06 0 57323741
Notice
ISTQB Expert Level (CTEL) Syllabus -Test Management (3)
VTB | 2015.09.13 | Votes 0 | Views 56818240
VTB 2015.09.13 0 56818240
Notice
ISTQB Expert Level (CTEL) Syllabus - Improving the Testing Process (1)
VTB | 2015.09.13 | Votes 0 | Views 57698687
VTB 2015.09.13 0 57698687
Notice
ISTQB Foundation Level (CTFL) Syllabus 2011 (12)
VTB | 2014.10.11 | Votes 0 | Views 57004854
VTB 2014.10.11 0 57004854
1258
ISTQB CTAL TAE Syllabus v2.0
admin | 2025.06.16 | Votes 1 | Views 35769130
admin 2025.06.16 1 35769130
1257
ISTQB Question and Answers (Advanced Level)
Steveskok | 2021.02.07 | Votes 0 | Views 57631784
Steveskok 2021.02.07 0 57631784
1256
ISTQB Certified Tester Foundation Level Syllabus Version 2018 V3.1
(TestExpert) | 2020.02.03 | Votes 0 | Views 56925982
(TestExpert) 2020.02.03 0 56925982
1255
ISTQB Advanced - Technical Test Analyst Sample Exam
ItSeTsQtB | 2019.08.08 | Votes 1 | Views 56822761
ItSeTsQtB 2019.08.08 1 56822761
1254
ISTQB Certification and Training Value
^Software^ | 2019.07.22 | Votes 0 | Views 58070925
^Software^ 2019.07.22 0 58070925
1253
ISTQB Foundation - Agile Tester (Sample Exam)
IT-Tester | 2019.07.08 | Votes 0 | Views 56115231
IT-Tester 2019.07.08 0 56115231
1252
ISTQB Advanced - Technical Test Analyst (Sample Exam)
IT-Tester | 2019.07.08 | Votes 0 | Views 56823938
IT-Tester 2019.07.08 0 56823938
1251
ISTQB Advanced - Test Analyst (Sample Exam) (1)
IT-Tester | 2019.07.08 | Votes 0 | Views 57754017
IT-Tester 2019.07.08 0 57754017
1250
Premium Question Paper 4 (3)
iknev | 2019.02.22 | Votes 0 | Views 58099725
iknev 2019.02.22 0 58099725
1249
Premium Question Paper 3 (6)
iknev | 2019.02.22 | Votes 0 | Views 56439404
iknev 2019.02.22 0 56439404
1248
Premium Question Paper 1 (2)
iknev | 2019.02.22 | Votes 0 | Views 57607006
iknev 2019.02.22 0 57607006
1247
ISTQB Question Bank_ Test Manager Sample Question Set 1
iknev | 2019.02.22 | Votes 1 | Views 57230446
iknev 2019.02.22 1 57230446
1246
ISTQB Certified Tester List (FULL)
VTB | 2018.10.31 | Votes 0 | Views 57669010
VTB 2018.10.31 0 57669010
1245
ISTQB Agile Exam (Auckland, NZ)
VTB | 2018.10.28 | Votes 0 | Views 57731590
VTB 2018.10.28 0 57731590
1244
ISTQB Foundation Exam (Auckland, NZ)
VTB | 2018.10.28 | Votes 0 | Views 57988827
VTB 2018.10.28 0 57988827
1243
ISTQB Foundation Course (Auckland, NZ)
VTB | 2018.10.28 | Votes 0 | Views 57106739
VTB 2018.10.28 0 57106739
1242
ISTQB Foundation Agile Course (Auckland, NZ)
VTB | 2018.10.28 | Votes 0 | Views 56524197
VTB 2018.10.28 0 56524197
1241
ISTQB Course + Internship (Auckland, NZ)
VTB | 2018.10.28 | Votes 0 | Views 57240409
VTB 2018.10.28 0 57240409
1240
ISTQB Expert - Improving the Test Process [Sample Exam & Answer] - ISTQB Official
VTB | 2018.10.26 | Votes 0 | Views 57386522
VTB 2018.10.26 0 57386522
1239
ISTQB Expert - Test Manager [Sample Exam & Answer] - ISTQB Official (1)
VTB | 2018.10.26 | Votes 0 | Views 57164769
VTB 2018.10.26 0 57164769
1238
ISTQB Advanced - Technical Test Analyst [Sample Exam & Answer] - ISTQB Official
VTB | 2018.10.26 | Votes 0 | Views 57537461
VTB 2018.10.26 0 57537461
1237
ISTQB Advanced - Test Analyst [Sample Exam & Answer] - ISTQB Official
VTB | 2018.10.26 | Votes 0 | Views 57505710
VTB 2018.10.26 0 57505710
1236
ISTQB Advanced - Test Manager [Sample Exam & Answer] - ISTQB Official (1)
VTB | 2018.10.26 | Votes 0 | Views 57654827
VTB 2018.10.26 0 57654827
1235
ISTQB Foundation - Model Based Tester [Sample Exam & Answers] - ISTQB Official
VTB | 2018.10.26 | Votes 0 | Views 57792577
VTB 2018.10.26 0 57792577
1234
ISTQB Foundation - Agile Tester [Sample Exam & Answer] - ISTQB Official
VTB | 2018.10.26 | Votes 0 | Views 56372986
VTB 2018.10.26 0 56372986
1233
ISTQB Foundation - Certified Tester [Sample Exam & Answer] - ISTQB Official (1)
VTB | 2018.10.26 | Votes 0 | Views 57221156
VTB 2018.10.26 0 57221156
1232
ISTQB Exam Tips and Tricks
VTB | 2018.10.16 | Votes 0 | Views 57825273
VTB 2018.10.16 0 57825273
1231
ISTQB Foundation Level Quiz 20 Questions (1)
aiitistqb | 2018.10.16 | Votes 0 | Views 58274598
aiitistqb 2018.10.16 0 58274598
1230
ISTQB Free Sample Exam and Answers
aiitistqb | 2018.10.16 | Votes 0 | Views 57079961
aiitistqb 2018.10.16 0 57079961
1229
ISTQB Foundation - Agile Extension Online Courses is live!!
VTB | 2018.10.16 | Votes 0 | Views 56788664
VTB 2018.10.16 0 56788664
1228
ISTQB Foundation Online Courses are Live!!
VTB | 2018.10.12 | Votes 0 | Views 58849483
VTB 2018.10.12 0 58849483
1227
ISTQB Foundation (Practice Exam)
VTB | 2018.10.12 | Votes 0 | Views 56874017
VTB 2018.10.12 0 56874017
1226
CTAL TM Questions (23)
ulissesmafra | 2018.10.09 | Votes 1 | Views 57050421
ulissesmafra 2018.10.09 1 57050421
1225
Syllabus 2012 (2)
ulissesmafra | 2018.10.09 | Votes 0 | Views 57960416
ulissesmafra 2018.10.09 0 57960416
1224
ISEB & ISTQB EXAM TIPS (3)
Sky Driver | 2018.09.24 | Votes 0 | Views 56629465
Sky Driver 2018.09.24 0 56629465
1223
Tips for clearing ISTQB Foundation Level Exam (1)
Sky Driver | 2018.09.24 | Votes 0 | Views 57912542
Sky Driver 2018.09.24 0 57912542
1222
Tips for passing the ISTQB Foundation Level exam – Do’s and Don’t’s
Sky Driver | 2018.09.24 | Votes 0 | Views 57774235
Sky Driver 2018.09.24 0 57774235
1221
Why do people fail the ISTQB Foundation Certificate? (1)
Sky Driver | 2018.09.24 | Votes 0 | Views 57167203
Sky Driver 2018.09.24 0 57167203
1220
ISTQB Foundation Mock Exam 2 (3)
peter_hey | 2018.09.19 | Votes 3 | Views 57900560
peter_hey 2018.09.19 3 57900560
1219
ISTQB Foundation Mock Exam 1 (3)
peter_hey | 2018.09.19 | Votes 0 | Views 56436208
peter_hey 2018.09.19 0 56436208
1218
What is ISTQB? (1)
master15 | 2018.09.19 | Votes 0 | Views 57866563
master15 2018.09.19 0 57866563
1217
Syllabus (2)
richp | 2018.09.18 | Votes 0 | Views 58020478
richp 2018.09.18 0 58020478
1216
Learning Objectives for ISTQB Advanced Level Technical Test Analyst Exam (1)
master15 | 2018.09.16 | Votes 0 | Views 57078129
master15 2018.09.16 0 57078129
1215
Software Testing Tools used by ISTQB certified Experts like Test Analysts and Technical Test Analysts (2)
master15 | 2018.09.16 | Votes 0 | Views 58101746
master15 2018.09.16 0 58101746
1214
What are the Advantages of ISTQB Certifications? (1)
master15 | 2018.09.13 | Votes 0 | Views 57507751
master15 2018.09.13 0 57507751
1213
How many Levels of Certification are provided by ISTQB? (1)
master15 | 2018.09.13 | Votes 0 | Views 57426742
master15 2018.09.13 0 57426742
1212
Syllabus CTAL-TTA - [BR] (1)
tcorteletti | 2018.09.09 | Votes 0 | Views 56556869
tcorteletti 2018.09.09 0 56556869
1211
Syllabus CTFL - [BR] (1)
tcorteletti | 2018.09.09 | Votes 0 | Views 56836687
tcorteletti 2018.09.09 0 56836687
1210
ISTQB Certification – Foundation Level syllabus
Sky Driver | 2018.09.05 | Votes 0 | Views 57086188
Sky Driver 2018.09.05 0 57086188
1209
Documents to be submitted at the time of registration of ISTQB Advanced Level (2)
Sky Driver | 2018.09.05 | Votes 0 | Views 57008222
Sky Driver 2018.09.05 0 57008222